ASCO Series 300 Quick Connect Power Panels
An ASCO quick connect panel is the docking station that connects a portable generator or a load bank with Cam-Lok cables.
Simple panels do one job: generator input or load-bank output. Dual-purpose panels put both connections in one cabinet.
On the dual-purpose units, Kirk-key interlocks keep the portable generator and the permanent generator from being connected at the same time.
A single automatic transfer switch does not provide NEC 700.3 backup-for-the-backup. That job needs either a dual-purpose quick connect panel with the proper interlocks, or a manual transfer switch plus a portable-generator connection.
Common units are stocked and other configurations are available to be built to your specifications. Let us know the ampacity, voltage, poles, enclosure, and whether you need generator input, load-bank output, or both.
What These Panels are For
Generator input for a portable or rental set
Load-bank output for testing the permanent generator
Dual-purpose cabinets when the job needs both connections in one box
Dual-purpose panels with Kirk-key interlocks can isolate the portable generator from the permanent generator for NEC 700.3 work
Which ASCO Quick Connect Panel Do You Need?
3QCN — Generator input panel. Male camlocks for a portable or rental generator.
3QCU — Load bank output panel. Female camlocks for a load bank.
3QCD — Dual-purpose quick connect panel. Generator input and load-bank output in one cabinet.
ASCO Quick Connect Panel Features
Series 16 Cam-Lok connectors
150 through 4000 amps, up to 600 volts
Type 3R enclosure is standard. 316 stainless Type 4X is available.
Wall-mount through about 800 amps, pad-mount on the larger frames
Lockable doors
Dual-purpose 150–800 amp units include a disconnect breaker and Kirk-key interlocks
Dual-purpose units above 800 amps have no breaker in the panel. They use a Kirk key with the permanent generator disconnect
Manual Transfer Switches With Quick Connects
An ASCO manual transfer switch with quick connects, used with the site’s automatic transfer switch, is one way to meet NEC 700.3 backup-for-the-backup
The other way is a dual-purpose quick connect panel with Kirk-key interlocks
MTQ / MUQ / MGQ / MPQ — manual transfer switch with generator quick connects, with or without breakers
MTDQ / MGDQ — dual-purpose manual transfer switch with generator and load-bank quick connects
We quote those from the same information as the stand-alone panels


